Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a fully engineered ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://businessbookmark.com/story6175152/penmann-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2